Copyright 2026 by Forsyth County, Georgia

Procurement Bid Portal

Forsyth County Procurement Portal (Bonfire)

Reference #: 26-38-5211. Name: Artificial Turf Replacement
Description: Providing all Materials, Equipment and Labor for the replacement of the rectangular artificial turf fields 6 and 8 at Fowler Park located at 4110 Carolene Way, Cumming, GA 30040. Project closes Apr 23, 2026 2:30 PM EDT.
Reference #: 25-44-1620. Name: Old Fire Station 9 Renovation
Description: Providing all Materials, Equipment and Labor for Old Fire Station 9 Interior Demolition. Project closes Apr 30, 2026 2:00 PM EDT.
Reference #: 26-49-2520. Name: Forsyth County Multi-Jurisdictional Hazard Mitigation Plan Update
Description: Forsyth County, Georgia (the “County”), is soliciting Proposals from qualified firms to provide professional services for the update and development of the Forsyth County Multi-Jurisdictional Hazard Mitigation Plan. The selected consultant will assist the County in updating the existing Hazard Mitigation Plan in accordance with the Disaster Mitigation Act of 2000 and FEMA requirements under 44 CFR §201.6, ensuring continued eligibility for federal hazard mitigation assistance programs. The project will include coordination with participating jurisdictions, public outreach, hazard risk assessment, development of mitigation strategies, and preparation of FEMA-compliant plan for review, adoption, and final approval. Project closes Apr 30, 2026 2:00 PM EDT.
Reference #: 26-53-1620. Name: Polo Fields Equestrian Center Demolition
Description: Contractor shall provide all labor, materials, equipment, and supervision necessary to demolish and remove all structures, foundations, footings, slabs, interior fencing, and associated improvements within the designated demolition limits as shown on site plans or as field-verified with the Owner prior to commencement. Structures Included in Demolition • Stable & Residence – Built 1987 – 4,560 SF • Barn – Built 1987 – 3,978 SF • Canopy – Built 1987 – 1,962 SF • Storage Building 1 – 288 SF • Storage Building 2 – 160 SF • Storage Building 3 – 482 SF • Concrete Slab – Approx. 11,500 SF Project closes May 07, 2026 2:00 PM EDT.
Reference #: 26-47-5211. Name: Central Park Playground Surface Replacement
Description: Forsyth County, Georgia is seeking competitive bids from qualified vendors to Provide all Materials, Equipment and Labor for the Central Park Playground surface replacement. Project closes May 14, 2026 2:00 PM EDT.
Reference #: 26-54-5211. Name: Polo Fields Fence Installation
Description: Provide all Materials, Equipment and Labor for Polo Fields Park Fence Installation Project closes May 14, 2026 2:00 PM EDT.
Reference #: 26-50-5211. Name: Natural Playfield Installation at Sawnee Mtn. Preserve
Description: Contractor shall provide all labor, materials, equipment, supervision, and incidentals for the construction of a durable, smooth, stable, level, and well-drained natural turf Playfield suitable for youth activities and general recreational programming. Project closes May 14, 2026 2:00 PM EDT.
Reference #: 26-56-5211. Name: Concession Services for Parks & Recreation
Description: Forsyth County, Georgia (the “County”) is seeking information from qualified concession service providers to support the operation of concession stands at multiple park locations within the County. The purpose of the Request for Information (RFI) is to gather input from qualified firms with expertise in concession services. The intent of this RFI is to gather industry feedback to refine the structure, scale, and financial model. Project closes May 15, 2026 2:00 PM EDT.
Reference #: 26-51-5211. Name: Chattahoochee Pointe Park Playground Design and Installation
Description: Forsyth County, Georgia (the “County”) is seeking proposals from qualified firms to provide a quality playground for ages 5-12, including installation and surfacing at Chattahoochee Pointe Park, 5790 Chattahoochee Pointe Drive, Suwanee, GA 30024. The County is seeking a playground supplier to design the playground, provide the proposed equipment, surfacing, and install the new equipment, surfacing, and subbase. The design must connect to the existing playground. Project closes May 21, 2026 2:00 PM EDT.