Copyright 2026 by Forsyth County, Georgia

Procurement Bid Portal

Forsyth County Procurement Portal (Bonfire)

Reference #: 26-60-1630. Name: Consultant Services for Comprehensive Plan Update (2026) with GIS Services
Description: Forsyth County, Georgia (the “County”) is soliciting proposals from qualified planning consultants to complete the state-required update to the County’s Comprehensive Plan in accordance with the minimum standards and procedures established by the Georgia Department of Community Affairs (DCA) and coordination with the Atlanta Regional Commission (ARC). The intent of this project is to develop an actionable, data-driven Comprehensive Plan that aligns future land use with infrastructure capacity, reflects community priorities, and provides clear implementation guidance for County decision making. Project closes Jun 04, 2026 2:00 PM EDT.
Reference #: 26-58-1620. Name: Water & Sewer Interior Renovations
Description: Forsyth County, Georgia is seeking competitive bids from qualified vendors to provide all materials, equipment and labor for the Water & Sewer Interior Renovations in accordance with the terms, conditions, and specifications contained in this Invitation to Bid (“ITB”). A mandatory pre-bid site visit will take place Monday, May 18, 2026 at 10:00 a.m. at the Water & Sewer Maintenance Building located at 4050 County Way, Cumming, GA 30028. Project closes Jun 18, 2026 2:00 PM EDT.
Reference #: 26-68-3320. Name: Kentmere Lift Station Modifications and Force Main Design
Description: The Forsyth County Board of Commissioners is soliciting bids from qualified firms to provide Construction services for the Forsyth County – Kentmere Lift Station Modifications and Force Main Design including the following major components: 1. Modifications to the existing Kentmere Lift Station pump control logic and wetwell control elevations, including the installation of two wetwell float switches. 2. Installation of two (2) new flow meter vaults with associated two (2) new magnetic flow meters (6- inch and 8-inch), one 6-inch and one 8-inch actuated plug valves, new yard piping and valves, and associated controls. 3. Approximately 20 linear feet of 8-inch ceramic epoxy lined ductile iron pipe (DIP) at the lift station site, 2,130 linear feet of 6-inch ceramic epoxy lined DIP force main and 265 linear feet of 8-inch polyvinyl chloride (PVC) gravity sewer pipe with associated manholes, valves, and appurtenances. Non-mandatory pre-bid meeting: 2:00 pm on Monday, June 22, 2026 at the Forsyth County Department of Water and Sewer, Kentmere LS, 3289 Glen Wallace Drive, Cumming, Georgia 30040. All work to be substantially completed within 485 calendar days from issuance of notice to proceed. Project closes Jul 02, 2026 2:00 PM EDT.
Reference #: 26-65-1514. Name: Progressive Design Build Services for SPLOST IX Bundle 5
Description: Progressive Design Build Services for SPLOST IX Bundle 5 • Old Atlanta Road Safety Improvements (Corridor Safety and Operational Improvement - PERS1 Project closes Jul 09, 2026 2:00 PM EDT.