Top Headlines
  Dept Headlines
DEPARTMENT

  Engineering Department

SUBDEPARTMENTS
  Construction Division
  Erosion & Sedimentation
  Right of Way Division
  Roads & Bridges
  Stormwater Division
  Traffic & Transportation
  Traffic Signals/Signs
  Utility Division

DEPARTMENT PAGES
  • 2013 RESURFACING
  • BIG CREEK GREENWAY MULTI-USE TRAIL - PHASES 4 & 5
  • BIKE/PEDESTRIAN WALKWAYS 2025 PLAN
  • BONDS / LETTERS OF CREDITS
  • CHECKLIST FORMS and CONSTRUCTION MANUAL
  • COMPREHENSIVE TRANSPORTATION PLAN NEEDS ASSESSMENT REPORT
  • ENVIRONMENTAL LINKS
  • FINAL PLAT SUBMITTAL INFORMATION/PROCEDURES
  • KELLY MILL ROAD WIDENING AND RECONSTRUCTION
  • McFARLAND ROAD / SHILOH ROAD SIDEWALK
  • OLD ATLANTA ROAD WIDENING AND RECONSTRUCTION
  • ORDINANCES - RULES - REGULATIONS
  • PILGRIM MILL ROAD WIDENING
  • SHARON ROAD WIDENING AND RECONSTRUCTION
  • SUBDIVISION AND ROAD NAME PROCEDURES
  • SURVEY; 2003 CUSTOMER SERVICE
  • TRANSPORTATION PLANS/PROJECTS
  • UNION HILL ROAD & MULLINAX ROAD WIDENING AND RECONSTRUCTION


  •  


    GDOT Announces New Signal on SR 141

    Updated August 7, 2012: The Georgia Department of Transportation (GDOT) announces the new traffic signal in at the intersection of State Route 141/Peachtree Parkway and Stoney Point Road will be operational before lunch today. The forecast is for rain this afternoon so crews are working to turn on the signal this morning. Originally the signal was planned to be operational this afternoon. The new signal is flashing in test mode now.

     

    WHAT:     A new traffic signal will become operational today

     

    WHERE:  State Route 141/Peachtree Parkway at Stoney Point Road in Cumming

     

    WHEN:     Today before lunch

                                                   

    “Crews are on site now to finish testing, double check signage and pavement markings before starting the signal. Once the signal is operational, please use extra caution until you get familiar with the new signal location. Remember to watch out for other drivers until they get used to the new signal too,” said Georgia DOT District Engineer Bayne Smith.

     


    August 2, 2012: The Georgia Department of Transportation (GDOT) announces a new traffic signal in at the intersection of State Route 141/Peachtree Parkway and Stoney Point Road. The new signal is flashing in test mode now. If weather permits and testing goes well, the signal will be operational the afternoon of Tuesday, August 7.

    Each intersection is reviewed to determine if the intersection meets the federal guidelines for the installation of a traffic signal. The intersection of State Route 141 and Stoney Point Road met those requirements.  

    “Once the signal is operational, please use extra caution until you get familiar with the new signal location. Remember to watch out for other drivers until they get used to the new signal too,” said Georgia DOT District Engineer Bayne Smith.

         
     
    NEWS
     No articles available

    EVENTS
     1 for your review

    ALERTS
     1 for your review


     Staff E-Mails

     Privacy
     Terms of Use
     Help

     

    110 East Main Street, Suite 120
    Cumming, GA
    FORSYTH COUNTY GOVERNMENTPhone: 770.781.2165
    Fax: 770.781.2104